In this project CJ Asphalt were approached to find a solution to up-grade an existing failing residential chip seal driveway on the Richmond hills.
CJ Asphalt handled everything in the project including:
Earthworks
Supply, level and compact AP40
Construction for passing bays and turnaround area
Rock drainage swale
Wooden edging
Asphalt preparation
Supply and lay 30mm Asphalt to the prepared pavement
The result was outstanding including its form and function.
Check out our similar case studies:
Daelyn Drive Subdivision
CJ Industries were awarded the contract to build a 16-lot subdivision at 10 Daelyn Drive Nelson and completed all works from start to finish including: GPS set out and machine control Bulk earthworks All drainage work including sub soil, sewage, stormwater and reticulated water Connection to council reticulated system Facilitation of power and communication contractors Nib and Kerb & channel Exposed aggregate concrete thresholds and...
See Project
Highland Drive Subdivision
CJ Industries were awarded the contact at 134 Champion Rd to build a 20-lot subdivision. CJ Industries completed all works on this project from start to finish. This scope of work included excavation and filling of 25,000m3 of clay to build roads and house platforms. This was a challenging site because of its proximity to an earthquake fault line and weak soil structures. Each lot...
See Project
Check out our related products: