TDC Road Construction

CJ Industries were contracted by Downer to reconstruct the access road into the Dovedale Water Scheme source which was affected by Cyclone Gita.  This involved clearing and reforming over 5km of road including installation of culvert pipes, fluming and forming of new water tables.

Check out our similar case studies:
Orchard Tracks
CJ industries have had a long involvement in roading whether it be a gravel orchard track, a road into a new house site, often finished in a 2 coat chip seal, asphalt or concrete surface. This job involved putting in several kilometres of new road around a local hop orchard. The scope included: Excavation of unsuitable material Supply, level and compact AP65, AP40 and AP20...
See Project
Check out our related products:
Asphalt

Asphalt surfacing is a more expensive option than chip-seal but does provide a heavy-duty and long-lasting pavement solution.

Read More
Earthworks

We have specialised equipment and experience in all types of earthworks ranging from small residential developments to large projects.

Read More