CJ Industries were awarded the contract to realign the road on the Motueka Valley Highway.
The scope included:
- Site set–out
- Temporary creek diversion
- Traffic management
- Quarry suitable rock for river erosion control
- Installation of box culvert
- Line river bank with rock
- Construct 2 coat chip–seal road to NZTA standard
Check out our similar case studies:
Champion Road Subdivision
CJ Industries were awarded the contact at 134 Champion Rd to build a 20-lot subdivision. CJ Industries completed all works from start to finish. Scope of works included excavation and filling of 25,000m3 of clay to build roads and house platforms. This was a challenging site because of the site’s close proximity to an earthquake fault line and weak soil structures. Each lot required the...
See Project
Daelyn Drive Subdivision
CJ Industries were awarded the contract to build a 16-lot subdivision at 10 Daelyn Drive Nelson and completed all works from start to finish including: GPS set out and machine control Bulk earthworks All drainage work including sub soil, sewage, stormwater and reticulated water Connection to council reticulated system Facilitation of power and communication contractors Nib and Kerb & channel Exposed aggregate concrete thresholds and...
See Project
Check out our related products: