This 120m long driveway required grading to shape with a crossfall into a 300mm deep swale drain. CJI Quarry basecourse was supplied, placed and compacted to ensure a sturdy base. A challenge of this project was the steep grade of the driveway, CJI safely and efficiently completed the project which delivered a long-term solution for the client access to their property.
Check out our similar case studies:
Orchard Tracks
CJ industries have had a long involvement in roading whether it be a gravel orchard track, a road into a new house site, often finished in a 2 coat chip seal, asphalt or concrete surface. This job involved putting in several kilometres of new road around a local hop orchard. The scope included: Excavation of unsuitable material Supply, level and compact AP65, AP40 and AP20...
See Project
Kaiteri Road Construction
CJ Industries won the contract to construct a new road into a private right of way in Kaiteriteri, Abel Tasman. The scope included: Arborist work clearing native and pine trees Cutting a new road through granite rock Supply and installation of culvert pipes Constructing a new road to local council specification from CJās certified basecourse and top course
See Project
Check out our related products: