Richmond West Berryfield Subdivision Stages 4A-9

CJ Industries commenced work on Stage 4A of this Berryfield Subdivision in May 2020. Due to the successful outcome of this project and the relationships formed with the client and engineers this led on to a further five stages totaling over 300 Sections continuing to November 2023. This project helps address the growing need for housing in the Richmond Community.

Tasks involved with these projects included:

• Earthworks
• Installation of 3 waters
• Roading
• Footpaths
• Landscaping

Check out our similar case studies:
Orchard Tracks
CJ industries have had a long involvement in roading whether it be a gravel orchard track, a road into a new house site, often finished in a 2 coat chip seal, asphalt or concrete surface. This job involved putting in several kilometres of new road around a local hop orchard. The scope included: Excavation of unsuitable material Supply, level and compact AP65, AP40 and AP20...
See Project
Kaiteri Road Construction
CJ Industries won the contract to construct a new road into a private right of way in Kaiteriteri, Abel Tasman. The scope included: Arborist work clearing native and pine trees Cutting a new road through granite rock Supply and installation of culvert pipes Constructing a new road to local council specification from CJ’s certified basecourse and top course  
See Project
Check out our related products:
Concrete Construction

CJ concrete construction includes commercial floor slabs buildings, yard slabs, driveways, cow sheds, roads, and foot paths.

Read More
Aggregate Supply

CJ Industries Ltd have extensive processing equipment to crush, wash and size rock extracted from our Quarries.

Read More