CJ Industries were awarded the contract to build a 16-lot subdivision at 10 Daelyn Drive Nelson and completed all works from start to finish including:
- GPS set out and machine control
- Bulk earthworks
- All drainage work including sub soil, sewage, stormwater and reticulated water
- Connection to council reticulated system
- Facilitation of power and communication contractors
- Nib and Kerb & channel
- Exposed aggregate concrete thresholds and concrete footpaths
- Paving stone thresholds
- Road and ROW formation and asphalt surface
- Final topsoil preparation and sow grass
Check out our similar case studies:
Highland Drive Subdivision
CJ Industries were awarded the contact at 134 Champion Rd to build a 20-lot subdivision. CJ Industries completed all works on this project from start to finish. This scope of work included excavation and filling of 25,000m3 of clay to build roads and house platforms. This was a challenging site because of its proximity to an earthquake fault line and weak soil structures. Each lot...
See Project
Gravel Driveway Marahau
This Project involved refurbishing a pre-existing 2km long driveway. To enhance drainage, culverts were incorporated, and a layer of CJI Quarry AP40 was provided, laid, and compacted for the final finish. The driveway had experienced significant degradation over numerous years due to adverse weather conditions. CJ Industries implemented a sustainable remedy, ensuring the driveway’s resilience against future weather events for the client.
See Project
Check out our related products: