CJ Industries were approached to construct two new concrete slabs to accommodate cold stores for an orchard. CJ Industries was the obvious fit for this job as we looked after the complete project from removing orchard trees right through to finishing the concrete slab.
The scope included:
Remove orchard trees
Strip topsoil and stockpile
Construct sub-base with certified CJ Industries quarry rock
Setout slab lines and levels
Supply and install formwork, reinforcing mesh and ties
Supply place and cure 1200m2 slabs
Expansion cutting
Form and finish metal road around perimeter of the cold stores
Check out our similar case studies:
Champion Road Subdivision
CJ Industries were awarded the contact at 134 Champion Rd to build a 20-lot subdivision. CJ Industries completed all works from start to finish. Scope of works included excavation and filling of 25,000m3 of clay to build roads and house platforms. This was a challenging site because of the site’s close proximity to an earthquake fault line and weak soil structures. Each lot required the...
See Project
Daelyn Drive Subdivision
CJ Industries were awarded the contract to build a 16-lot subdivision at 10 Daelyn Drive Nelson and completed all works from start to finish including: GPS set out and machine control Bulk earthworks All drainage work including sub soil, sewage, stormwater and reticulated water Connection to council reticulated system Facilitation of power and communication contractors Nib and Kerb & channel Exposed aggregate concrete thresholds and...
See Project
Check out our related products: