Fairfield Coolstore Slabs

CJ Industries were approached to construct two new concrete slabs to accommodate cold stores for an orchard.  CJ Industries was the obvious fit for this job as we looked after the complete project from removing orchard trees right through to finishing the concrete slab.

The scope included:

Remove orchard trees

Strip topsoil and stockpile

Construct sub-base with certified CJ Industries quarry rock

Setout slab lines and levels

Supply and install formwork, reinforcing mesh and ties

Supply place and cure 1200m2 slabs

Expansion cutting

Form and finish metal road around perimeter of the cold stores

Check out our similar case studies:
Champion Road Subdivision
CJ Industries were awarded the contact at 134 Champion Rd to build a 20-lot subdivision. CJ Industries completed all works from start to finish. Scope of works included excavation and filling of 25,000m3 of clay to build roads and house platforms. This was a challenging site because of the site’s close proximity to an earthquake fault line and weak soil structures. Each lot required the...
See Project
Daelyn Drive Subdivision
CJ Industries were awarded the contract to build a 16-lot subdivision at 10 Daelyn Drive Nelson and completed all works from start to finish including: GPS set out and machine control Bulk earthworks All drainage work including sub soil, sewage, stormwater and reticulated water Connection to council reticulated system Facilitation of power and communication contractors Nib and Kerb & channel Exposed aggregate concrete thresholds and...
See Project
Check out our related products:
Earthworks

We have specialised equipment and experience in all types of earthworks ranging from small residential developments to large projects.

Read More
Delivery

Our trucking fleet can be adapted to all your requirements from shifting 30 tonne to 2 tonne pay load.

Read More