CJ industries were contracted to construct earthworks, drainage and concrete slab for Saxton Fruit in Nelson.
The scope included:
- Installation of stormwater, sanitary sewer and reticulated water for new building
- Supply level and compact sub-base
- Installation of precast retaining wall
- Supply and install formwork, reinforcing mesh and tie
- Supply place and cure 2500 M2 concrete floor slab
- Expansion cutting
- Form and finish 2 coat chip-seal road around perimeter of building
Check out our similar case studies:
Champion Road Subdivision
CJ Industries were awarded the contact at 134 Champion Rd to build a 20-lot subdivision. CJ Industries completed all works from start to finish. Scope of works included excavation and filling of 25,000m3 of clay to build roads and house platforms. This was a challenging site because of the site’s close proximity to an earthquake fault line and weak soil structures. Each lot required the...
See Project
Daelyn Drive Subdivision
CJ Industries were awarded the contract to build a 16-lot subdivision at 10 Daelyn Drive Nelson and completed all works from start to finish including: GPS set out and machine control Bulk earthworks All drainage work including sub soil, sewage, stormwater and reticulated water Connection to council reticulated system Facilitation of power and communication contractors Nib and Kerb & channel Exposed aggregate concrete thresholds and...
See Project
Check out our related products: