CJ Asphalt were awarded the contract by Downer supply and lay 25mm asphalt to overlay the existing failing chip sealed car park area at the Tahunanui beach.
The scope included:
- Site setout
- Milling of existing high areas and key into existing kerb and channel
- Asphalt pre-levelling
- Supply and apply an emulsion tack-coat
- Supply and lay of 25mm of asphalt to the prepared pavement
Check out our similar case studies:
Daelyn Drive Subdivision
CJ Industries were awarded the contract to build a 16-lot subdivision at 10 Daelyn Drive Nelson and completed all works from start to finish including: GPS set out and machine control Bulk earthworks All drainage work including sub soil, sewage, stormwater and reticulated water Connection to council reticulated system Facilitation of power and communication contractors Nib and Kerb & channel Exposed aggregate concrete thresholds and...
See Project
Highland Drive Subdivision
CJ Industries were awarded the contact at 134 Champion Rd to build a 20-lot subdivision. CJ Industries completed all works on this project from start to finish. This scope of work included excavation and filling of 25,000m3 of clay to build roads and house platforms. This was a challenging site because of its proximity to an earthquake fault line and weak soil structures. Each lot...
See Project
Check out our related products: